Difference between revisions of "Msc2G2:Optimisation"

From 100ybp
Jump to: navigation, search
(MSc2 Group 2)
(MSc2 Group 2)
Line 39: Line 39:
 
Sketch of the final outside surface optimised for rainwater drainage
 
Sketch of the final outside surface optimised for rainwater drainage
  
[[File:Drainage_&_structure.jpg|850px]]
+
[[File:Pavilion Sketch1.jpg|850px]]

Revision as of 13:15, 29 March 2019

MSc2 Group 2

Header.jpg


Students: Rick van Dijk, Nikolaus Houben, Femke Lokhorst, Ian Omumbwa, Hamid Reza Shahriari, Thierry Syriani



Drainage & structure.jpg



Sketch of the final outside surface optimised for rainwater drainage

850px